Our “Core 24”

24-Section Construction Standard

  1. General Project Details & Municipal Compliance
    Detailed project specs (square footage, layout, structural foundation type), engineering plan alignment, Pennsylvania Uniform Construction Code (UCC) adherence, and municipal permit protocols.
  2. Site Feasibility, Clearing & Lot Prep
    On-site evaluations, land clearing, forestry mulching, tree removal, topsoil stripping, and boundary/elevation staking.
  3. Foundation Excavation & Earthwork
    Basement/footing digging, building pad rough grading, temporary construction driveway installation, and structural backfilling.
  4. Utility Trenching & Civil Infrastructure
    Trenching, piping, conduit placement, and municipal tap-ins for water, sanitary sewer, natural gas, and electric services.
  5. Footings & Foundation
    Continuous concrete footings below frost depth, poured 8″ concrete foundation walls, rebar reinforcement (#4 and #5), anchor bolt placements, and basement slab prep.
  6. Foundation Waterproofing & Drainage Systems
    Exterior foundation waterproofing membranes, perimeter drain tile systems, sump pit and pump installations, and rigid foundation insulation.
  7. Structural Framing & Engineered Systems
    2 x 6 exterior wall framing (16″ O.C.), 2 x 4 interior walls, engineered floor trusses, engineered roof truss packages, LVLs/structural beams, and 3/4″ glued/nailed subflooring.
  8. Roofing Assembly
    1/2″ OSB roof sheathing with H-clips, synthetic underlayment, ice & water shield at eaves, dimensional asphalt shingles or standing seam metal roofing, ridge/eave venting, and flashing.
  9. Exterior Sheathing & Finishes
    House wrap installation, lap siding, board & batten siding, thin-set stone veneer accents, trim boards, 8×8 porch posts, and decorative railings.
  10. Windows & Exterior Doors
    Energy-efficient window units (casements/transoms), exterior entry doors, double-paned sliders, garage doors, and full opening flashing tape integration.
  11. Plumbing Rough-In
    Water service main shutoff, supply and drain line routing, stack venting, tub/shower unit installations, laundry hookups, and water heater placement.
  12. Electrical Rough-In
    200A/400A service panel setup, branch circuit wiring, recessed lighting cans, exterior fixture points, GFCI circuits, smoke/CO detector wiring, and appliance rough-ins.
  13. HVAC Rough-In
    Furnace and A/C condenser unit placement, main supply/return ductwork fabrication, bath exhaust fans, dryer vent routing, and fresh air intake systems.
  14. Thermal Insulation & Energy Envelope
    R-19 exterior wall insulation, R-38 attic insulation, continuous eave baffles, rim joist air sealing, and energy code compliance.
  15. Exterior Concrete & Flatwork
    Poured concrete front porch slabs, rear patio slabs, sloped garage floor slabs, concrete walkways, and driveway aprons.
  16. Final Grading, Landscaping & Site Clean
    Final grade establishment for positive drainage away from foundations, seed/straw or sod placement, and final jobsite debris removal.
  17. Drywall & Surface Preparation
    1/2″ wall/ceiling drywall installation, 5/8″ Type X fire-rated drywall in garage spaces, taping, mudding, sanding, and level 4/5 paint-ready finishing.
  18. Interior Trim, Doors & Millwork
    Interior doors, baseboards, door/window casings, closet shelving, stair handrails, and decorative woodwork.
  19. Cabinetry & Countertops
    Kitchen and bathroom vanity cabinet installations according to architectural elevations, custom layout fitting, and countertop installations.
  20. Flooring Systems
    Subfloor prep, luxury vinyl plank (LVP), ceramic tile, and carpet installations per room schedules.
  21. Interior Paint & Coatings
    Primer coat, wall finish coats, ceiling paint, and enamel trim/door paint application.
  22. Final Mechanical, Electrical & Plumbing (MEP) Trim
    Setting plumbing fixtures/faucets, installing light fixtures/switches/outlets, HVAC register installation, thermostat setup, and system commissioning.
  23. Hardware, Mirrors & Interior Final
    Door hardware, bathroom mirrors, accessories, paint touch-ups, and detailed deep cleaning.
  24. Inspection Sign-Offs & Key Turnover
    Scheduling and passing all municipal milestone inspections (footing, foundation, framing, MEP rough-ins, insulation, and final Certificate of Occupancy).